Ward Infrastructure Improvements

Alderman Moore knows the importance of improving streets, alleys, sidewalks, and our sewer and water mains. These improvements have been made since 2015:

  • 108 streets resurfaced
  • 47 alleys and alley aprons resurfaced
  • 38 new sidewalks installed
  • 7 blocks with new streetlights
  • 14 blocks with new water mains
  • 11 blocks with new sewer mains
  • 8 blocks with new bike lanes

Other Ward Infrastructure Improvements:

2018: Construction of 49th Ward Greenway – Bicycle and pedestrian improvements.

2017: Touhy/Ridge/Rogers intersection improvements.